NuGreen were engaged by Toll NZ and their Landlord Argosy Property to provide a Solution at their Whangarei Distribution Centre. NuGreen won the project after listening to the clients needs and the attention to detail including the steel rods in the high windage area ensured success.

NuGreen were also able to reduce the amount of fittings whilst also improving the light levels from 80lux in some points to over 300lux.

The exterior area was also upgraded and the old “shoebox” mercury vapour fittings were also replaced with the same fitting providing a high IP rating and also a marine grade housing which was perfect for the project which is situated close to the Port. Both Landlord and tenant were exceptionally pleased with the outcome and how the NuGreen team performed.

Find out More Download Case Study.